News

May 24, 2019

Zilift's SpeedDrive 350 is a rig-less, cable deployed ESP system which can be fully retrofitted through existing tubing. The system delivers 300+HP and flow rates of up to 10,000bfpd through 4-1/2” tubing and has the benefit of integrated downhole monitoring. In early...

April 18, 2019

We recently shipped some of our first SpeedDrive 2625 units to the US where they will be deployed on cable, through the existing tubing into wells that have been down for months because it's not economical for the client to schedule a rig. The SpeedDrive 2625 excels in...

February 20, 2019

As Nasir Al-Naimi [Vice President, Petroleum Engineering and Development, Saudi Aramco] eloquently put during the opening ceremony at the recent SPE Middle East Artificial Lift Conference & Exhibition, "Rigs are eating our lunch", and by this he meant we need to be fin...

January 15, 2019

The SpeedDrive 350 system is a high speed ESP, deployable through 4.5-in or larger tubing without needing a rig at any stage during installation or recovery. The system is less than 60ft total length, is driven by a 300hp permanent magnet motor and can operate at rates...

August 27, 2018

Innovation is the theme at Offshore North Sea 2018 in Stavanger this week, and so it's no surprise that Zilift are right in the heart of the exhibition. Come and see what's new at stand 9230.

October 9, 2017

Zilift are pleased to announce that they will be working in conjunction with a major Canadian Oil and Gas operator to explore the feasibility of Zilift RodDrive technology.  RodDrive is a combination of Zilift unique downhole Torque Converter (or magnetic gear box) dri...

September 19, 2017

Zilift have released a short video overviewing our experience in rigless installation of a through tubing cable deployed pump, operation of the system (including fluid flow) and - as importantly - the ability to retrieve the system to surface.  All under live well oper...

August 16, 2017

With Zilift, all it takes is two trailers and a mobile crane....

This video, shot during a recent deployment demonstration in a Californian oilfield shows the entire equipment mobilization to run the pump - all of which can be achieved inside a single shift.

Using conven...

May 23, 2017

Just as the Proclaimers celebrated walking 500 miles, Zilift are celebrating running for 500 days!  Our TorqueDrive technology installed in a highly deviated and slim-bore well in California recently passed this significant milestone and continues to produce from a wel...

April 14, 2017

Zilift are pleased to advise that we are moving!  Our new dedicated facility in Dyce, Aberdeen provides us with 378sqm (4,048sqft) of office space
and 890sqm (9,587sqft) of workshop complete with dual overhead cranes.  

The new facility allows us to create dedicated wor...

Please reload

Featured News

Zilift proves its cable deployment method

February 20, 2019

1/2
Please reload